ECE R115 PDF

ECE R115 PDF

admin

February 5, 2021

Regulation No of the Economic Commission for Europe of the United Nations (UN/ECE) Uniform provisions concerning the approval of: I. specific LPG . R is a European retrofit directive for LPG and CNG systems. This directive stipulates the emission, documentation and quality standards to be met by the. ece r pdf Vehicle Technology Division THE NETHERLANDS ( N E D E R L A N D) COMMUNICATION. Concerning(1): approval granted approval extended.

Author: Mutilar Tunris
Country: Burundi
Language: English (Spanish)
Genre: Automotive
Published (Last): 9 August 2006
Pages: 375
PDF File Size: 17.42 Mb
ePub File Size: 2.24 Mb
ISBN: 243-6-36476-808-9
Downloads: 31318
Price: Free* [*Free Regsitration Required]
Uploader: Daijas

The rolling resistance of the parent vehicle shall correspond to the original vehicle value proportionally adjusted to the parent vehicle mass measured or calculated as above:. Special provisions for petrol direct injection engines Notwithstanding the paragraph 6.

R15 the rr115 fuelling system has an individual metering per cylinder: The installation manual shall contain the detailed procedures and actions which shall be taken by the installer to check whether the system has been assembled in order to safely perform and to abide by the installation instructions.

Help Print this page. Drawings of the installation of the container … 2. Multi-valve description include drawings … 2. Installation manual see para. EU case law Case law Digital reports Directory of case law. The installation manual shall contain the start-up operations which shall be performed by the installer.

Level indicator The user manual shall state the location of the level indicator, for example at the dashboard or at the container.

Ece r115 pdf

The requirements of Regulation No 67, 01 series of amendments, concerning the fixation of LPG container s or those of Regulation No concerning the fixation of CNG container s shall be deemed to be met if the container is secured to the motor vehicle by at least:. Category and identification type …. Requirements for the installation of specific equipment for the use of compressed natural gas CNG in the propulsion system of a eece 6.

  GEOMATRIX TECHNOLOGY PDF

The installation manual shall contain the maintenance schedule in which all the ordinary service type which the single components as well as the system shall undergo through their working life time and km covered by the vehicle will be specified. Chassis identification number ….

ECE regulations: ECE R Supplement 5

Description of r15 parent vehicle 1. The Parties to the Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of the Type-Approval Authorities which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, issued in other countries, are to be sent.

This Regulation does not apply to the procedures, checks and inspections aimed at verifying the correct installation of the retrofit systems on vehicles, since this matter relies on the competence of the Contracting Party where the vehicle is registered.

The emissions of CO 2 are calculated according to Regulation No for each parent vehicle, if applicable. Application for approval 4.

Certifications

Components indicated in Regulation No and defined as necessary. Internal combustion engine identification type … 1. The documents filed with the application or extension of approval can be obtained upon request. Measurements of cee emissions shall be performed after a cold start with each fuel: All retrofit systems, installed in the vehicle belonging to the family, as defined in paragraph 2 of this Regulation, shall be identified by a plate, in which the approval number, and the technical specifications, f115 required in Annexes 2A and 2B shall be placed.

Vehicles type s for which the retrofit equipment type is qualified: One LPG retrofit system sample, as described in paragraph 2. This paragraph is reserved for the specific requirements for emissions of diesel engines approved according to Regulation No 49 and equipped with a retrofit LPG system dual fuel if required.

  GUIAS DE MANEJO DE PANCREATITIS 2010 FILETYPE PDF

LPG collection on eBay!

The LPG ratio of the energy consumed in the cycle is then determined as follows: The system manufacturer shall provide specific instructions as to read out the CNG fault codes referred to in paragraph 6. With regard to requirement of paragraph 2. Description of the LPG retrofit system. However, at the location of the fixation of the washers or plates to the vehicle body no compressible material should be present.

Description of the parent vehicle s on which the requirements of this Regulation are going to be tested. SCOPE To describe r1155 procedures to be undertaken by the installer to verify the gas-tightness of the system.

Engine starting-up It is permissible that the engine is started on petrol and switched to CNG after a predetermined eve of time which cannot be changed by the driver. For each vehicle of the family, the official values of engine power are multiplied by the above ratio. During a Type I test on petrol the original malfunction indicator MI shall activate due to the electrical disconnection of any original emission-related component. Switch-over procedure The user manual shall clearly describe the method of switching over from one to the other alternative r15 by giving the sequence of operations.